- This bespoke kitchen was constructed over a two week period. Most of the joinery was constructed off-site then fitted whilst the kitchen was still in use. Tiling and considerate/sympathetic decoration finished off this beautiful kitchen.
Please watch the video on the left or click the link below for the full sized pictures:
